Commercial Tenant Build-Outs in Southwest Florida
PLANNING A COMMERCIAL SPACE BEFORE YOU SIGN THE LEASE?
RETAIL & OFFICE BUILD-OUTS
COMMERCIAL TENANT IMPROVEMENTS IN SOUTHWEST FLORIDA
RESTAURANT & HOSPITALITY BUILD-OUTS
OUR COMMERCIAL CONSTRUCTION PROCESS
Every commercial build-out is different, but most projects move through six core stages. Build Up coordinates the project with business owners, property representatives, design professionals, trades, and inspectors from early site evaluation through project completion.
SITE EVALUATION & PRELIMINARY BUDGET
Review the proposed space, intended use, existing conditions, potential construction challenges, and a preliminary project budget before major commitments are made.
PLANS, DESIGN & PRECONSTRUCTION
Coordinate the construction scope with the owner, architect, engineer, property manager, and other project professionals as plans and specifications are developed.
PERMITTING & APPROVALS
Coordinate permit applications, required documentation, plan-review responses, and the approvals needed to move the project into construction.
DEMOLITION & CONSTRUCTION
Begin approved demolition and construction, including framing and the physical improvements required to prepare the space for its intended use.
TRADES, MEP & INTERIOR FINISHES
Coordinate electrical, plumbing, HVAC, and other trades alongside interior finishes while managing construction sequencing and project progress.
INSPECTIONS & PROJECT COMPLETION
Coordinate required construction inspections, complete outstanding work, and prepare the finished space for turnover and the client's next stage of occupancy or opening.
FEATURED COMMERCIAL PROJECT
CRAVE COOKIE — BABCOCK RANCH
Build Up Contracting By Design served as General Contractor for the approximately 960-square-foot Crave Cookie restaurant tenant build-out at 42091 Cypress Pkwy, Suite 6, in Babcock Ranch, Florida.
Completed in June 2026, the project moved through approximately six months of permitting and review, construction, inspections, and final approvals. Build Up carried the project through final inspections and opening.
PROJECT SCOPE
- Demolition
- Framing and drywall
- Wall tile and flooring
- Painting and millwork
- Equipment installation
- Plumbing, electrical, and HVAC coordination
- Permitting and inspections
- Owner, architect, engineer, and trade coordination
PROJECT CHALLENGE & OUR APPROACH
The proposed use required additional coordination to determine the appropriate grease-interceptor requirements. Build Up worked with the engineer, plumber, and reviewing officials through multiple rounds of coordination to resolve the issue and keep the project moving toward approval.
THREE CRAVE COOKIE LOCATIONS COMPLETED
Build Up Contracting By Design has completed three Crave Cookie locations:
- Babcock Ranch — 42091 Cypress Pkwy, Suite 6, Punta Gorda
- Lakewood Ranch — 11161 E State Road 70, Unit 107
- Temple Terrace — 1301 N 56th St, Suite 8